FERC staff's winter assessment says generating resources are expected to meet normal winter demand and reserve needs, drawing on NERC's regional analysis. Prolonged extreme cold could still create local problems: SERC-East faces elevated risk, New England could deplete stored fuel rapidly, and import-dependent parts of MISO and SPP could encounter operating shortfalls. The report covers December 2026 through February 2027.
Why it matters
Having enough generating capacity in aggregate does not ensure that fuel and electricity can reach every constrained area during a sustained cold spell.
What the evidence cannot tell us
- This is a conditional risk assessment, not a prediction that blackouts will occur.
- It is a FERC staff report; its views do not necessarily represent the Commission or individual commissioners.
Read the sources. Credit the work.
The reporting and documents behind this brief, linked directly to the source. Verified publisher and author credits appear where available; other entries show their actual website address. Several links may draw on the same underlying reporting or research.
ferc.gov
Winter Energy Market & Electric Reliability Assessment (opens in a new tab)ferc.gov · November 19, 2026
Primary document / sourceContent read for this publication · November 20, 2026
This story was written and checked using AI against the linked evidence. No routine human review is claimed. Read the method.
Suggest an update or correctionPublished corrections